Architecture & Planning

Topographic survey delivered for the Kawangu site

The topographic survey of the 4,200 m² Rumah Kambera site in Kawangu is complete. A survey team measured levels, contours, access routes and drainage features on 19 August, using a total station and GPS. The final report and drawings at 1:1,000 scale were handed over on 24 August.

The survey cost IDR 5 million, approximately CHF 230 at the time. These measurements give the designers a reliable basis for planning foundations, drainage and site levelling instead of relying on assumptions about the ground.

Read the original topographic survey update from 26 August 2026 ↗

A construction update from Rumah Kambera, East Sumba.