{"id":681,"date":"2026-10-23T11:34:50","date_gmt":"2026-10-23T03:34:50","guid":{"rendered":"https:\/\/rumahkambera.fairfuturefoundation.org\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/"},"modified":"2026-10-23T11:46:34","modified_gmt":"2026-10-23T03:46:34","slug":"rumah-kambera-sirtu-75-camion-di-carico-il-23-ottobre-2026","status":"publish","type":"rk_field_note","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/","title":{"rendered":"Le consegne di Sirtu sono quasi completate: 75 dei 100 camion sono gi\u00e0 stati ricevuti"},"content":{"rendered":"<p>Oggi, gioved\u00ec 22 ottobre 2026, abbiamo raggiunto <strong>75 camion di sirtu<\/strong> consegnato per il nuovo centro Rumah Kambera socio-medico Kawangu di East Sumba.<\/p>\n<p>Oggi, venerd\u00ec 23 ottobre, ci aspettiamo di ricevere il resto <strong>25 camion carichi<\/strong> e completare il totale previsto <strong>100 consegne<\/strong>. Questo \u00e8 l\u2019obiettivo di oggi. Confermeremo il conteggio finale non appena arriveranno gli ultimi camion.<\/p>\n<p>Per il momento, il materiale viene depositato in molti massi separati lungo la parte inferiore e rialzata del terreno. <strong>La prossima settimana abbiamo intenzione di portare un escavatore per estrarre, distribuire e livellare il terreno.<\/strong>, distribuendolo sulla zona da rialzare. Questa \u00e8 la fase che render\u00e0 le pile separate pi\u00f9 uniformi.<\/p>\n<p>Queste opere seguono la mappatura topografica del Kawangu sito e preparano il terreno per gli edifici futuri. La ricezione del materiale \u00e8 un primo passo; il successivo \u00e8 la levigatura accurata del terreno. Entrambi questi aspetti devono essere risolti prima che la costruzione possa procedere.<\/p>","protected":false},"excerpt":{"rendered":"<p>23 ottobre 2026: Ad oggi, 75 dei 100 carichi di sirtu previsti sono arrivati Rumah Kambera. Gli altri 25 sono previsti per oggi, in vista del livellamento con gli escavatori previsto per la prossima settimana.<\/p>","protected":false},"author":1,"featured_media":682,"template":"","rk_note_topic":[10],"class_list":["post-681","rk_field_note","type-rk_field_note","status-publish","has-post-thumbnail","hentry","rk_note_topic-construction-infrastructure"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"By 22 October, 75 sirtu truckloads had reached Rumah Kambera. The final 25 are expected on 23 October, with land levelling planned for next week.\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"Alex\"\/>\n\t<meta name=\"p:domain_verify\" content=\"eec8952b4679e043cc524cc08174327e\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"it_IT\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Rumah Kambera | Fair Future Foundation - Building a permanent medical, social and logistics centre in East Sumba.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"75 of 100 sirtu truckloads delivered to Rumah Kambera\" \/>\n\t\t<meta property=\"og:description\" content=\"Deliveries are expected to finish on 23 October. Next week an excavator will spread and level the fill across the sloping section of the Kawangu site.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t\t<meta property=\"og:image:height\" content=\"720\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-23T03:34:50+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-23T03:46:34+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/fairfuturefoundation\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@fairfuture\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Rumah Kambera: 75 of 100 truckloads delivered\" \/>\n\t\t<meta name=\"twitter:description\" content=\"Sirtu deliveries approach completion in Kawangu, ahead of next week&#039;s land levelling.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@fairfuture\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/thumbs-rk2-simulation-sketchup-1920x1080-1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#blogposting\",\"name\":\"Rumah Kambera sirtu deliveries | 75 of 100 truckloads\",\"headline\":\"Sirtu deliveries near completion: 75 of 100 truckloads received\",\"author\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/author\\\/alex\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg\",\"width\":1280,\"height\":720,\"caption\":\"An excavator loads material into a truck for the Rumah Kambera land preparation works, October 2026.\"},\"datePublished\":\"2026-10-23T11:34:50+08:00\",\"dateModified\":\"2026-10-23T11:46:34+08:00\",\"inLanguage\":\"it-IT\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#webpage\"},\"articleSection\":\"Construction &amp; Infrastructure\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/#listItem\",\"name\":\"Field Notes\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/#listItem\",\"position\":2,\"name\":\"Field Notes\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"name\":\"Construction &amp; Infrastructure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"position\":3,\"name\":\"Construction &amp; Infrastructure\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#listItem\",\"name\":\"Sirtu deliveries near completion: 75 of 100 truckloads received\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/#listItem\",\"name\":\"Field Notes\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#listItem\",\"position\":4,\"name\":\"Sirtu deliveries near completion: 75 of 100 truckloads received\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"name\":\"Construction &amp; Infrastructure\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#organization\",\"name\":\"Fair Future Foundation\",\"description\":\"Swiss medical nonprofit supporting primary care, clean water, prevention and community health in rural East Sumba, Indonesia.\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/\",\"telephone\":\"+6287777333384\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/fair-future-foundation-logo-swiss-flag.png\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#organizationLogo\",\"width\":300,\"height\":61,\"caption\":\"Fair Future Foundation, Switzerland.\"},\"image\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/fairfuturefoundation\\\/\",\"https:\\\/\\\/x.com\\\/fairfuture\",\"https:\\\/\\\/www.instagram.com\\\/fairfuturefoundation\\\/\",\"https:\\\/\\\/www.tiktok.com\\\/@fairfuturefoundation\",\"https:\\\/\\\/id.pinterest.com\\\/fairfuturefoundation\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/FairFutureFoundation\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/fair-future-foundation\\\/\",\"https:\\\/\\\/bsky.app\\\/profile\\\/fairfuturefoundation.org\",\"https:\\\/\\\/www.threads.com\\\/@fairfuturefoundation\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/author\\\/alex\\\/#author\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/author\\\/alex\\\/\",\"name\":\"Alex\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1533db74d7967001a3bd31a71806f2622ba29add6c5e7758f02e4e6ef4ebdaca?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Alex\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#webpage\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/\",\"name\":\"Rumah Kambera sirtu deliveries | 75 of 100 truckloads\",\"description\":\"By 22 October, 75 sirtu truckloads had reached Rumah Kambera. The final 25 are expected on 23 October, with land levelling planned for next week.\",\"inLanguage\":\"it-IT\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/author\\\/alex\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/author\\\/alex\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#mainImage\",\"width\":1280,\"height\":720,\"caption\":\"An excavator loads material into a truck for the Rumah Kambera land preparation works, October 2026.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/field-notes\\\/rumah-kambera-sirtu-75-truckloads-october-23-2026\\\/#mainImage\"},\"datePublished\":\"2026-10-23T11:34:50+08:00\",\"dateModified\":\"2026-10-23T11:46:34+08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#website\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/\",\"name\":\"Rumah Kambera | Fair Future Foundation\",\"description\":\"Building a permanent medical, social and logistics centre in East Sumba.\",\"inLanguage\":\"it-IT\",\"publisher\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/it\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Rumah Kambera sirtu deliveries | 75 of 100 truckloads<\/title>\n\n","aioseo_head_json":{"title":"Rumah Kambera Consegne sirtu | 75 dei 100 camion","description":"Il 22 ottobre erano gi\u00e0 arrivati 75 camion sirtu Rumah Kambera; gli ultimi 25 sono previsti per il 23 ottobre, mentre il livellamento del terreno \u00e8 previsto per la prossima settimana.","canonical_url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"p:domain_verify":"eec8952b4679e043cc524cc08174327e","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#blogposting","name":"Rumah Kambera sirtu deliveries | 75 of 100 truckloads","headline":"Sirtu deliveries near completion: 75 of 100 truckloads received","author":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/author\/alex\/#author"},"publisher":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg","width":1280,"height":720,"caption":"An excavator loads material into a truck for the Rumah Kambera land preparation works, October 2026."},"datePublished":"2026-10-23T11:34:50+08:00","dateModified":"2026-10-23T11:46:34+08:00","inLanguage":"it-IT","mainEntityOfPage":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#webpage"},"isPartOf":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#webpage"},"articleSection":"Construction &amp; Infrastructure"},{"@type":"BreadcrumbList","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#listItem","position":1,"name":"Home","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/#listItem","name":"Field Notes"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/#listItem","position":2,"name":"Field Notes","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/#listItem","name":"Construction &amp; Infrastructure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/#listItem","position":3,"name":"Construction &amp; Infrastructure","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#listItem","name":"Sirtu deliveries near completion: 75 of 100 truckloads received"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/#listItem","name":"Field Notes"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#listItem","position":4,"name":"Sirtu deliveries near completion: 75 of 100 truckloads received","previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/#listItem","name":"Construction &amp; Infrastructure"}}]},{"@type":"Organization","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#organization","name":"Fair Future Foundation","description":"Swiss medical nonprofit supporting primary care, clean water, prevention and community health in rural East Sumba, Indonesia.","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/","telephone":"+6287777333384","logo":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/fair-future-foundation-logo-swiss-flag.png","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#organizationLogo","width":300,"height":61,"caption":"Fair Future Foundation, Switzerland."},"image":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/fairfuturefoundation\/","https:\/\/x.com\/fairfuture","https:\/\/www.instagram.com\/fairfuturefoundation\/","https:\/\/www.tiktok.com\/@fairfuturefoundation","https:\/\/id.pinterest.com\/fairfuturefoundation","https:\/\/www.youtube.com\/c\/FairFutureFoundation","https:\/\/www.linkedin.com\/company\/fair-future-foundation\/","https:\/\/bsky.app\/profile\/fairfuturefoundation.org","https:\/\/www.threads.com\/@fairfuturefoundation"]},{"@type":"Person","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/author\/alex\/#author","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/author\/alex\/","name":"Alex","image":{"@type":"ImageObject","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/1533db74d7967001a3bd31a71806f2622ba29add6c5e7758f02e4e6ef4ebdaca?s=96&d=mm&r=g","width":96,"height":96,"caption":"Alex"}},{"@type":"WebPage","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#webpage","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/","name":"Rumah Kambera sirtu deliveries | 75 of 100 truckloads","description":"By 22 October, 75 sirtu truckloads had reached Rumah Kambera. The final 25 are expected on 23 October, with land levelling planned for next week.","inLanguage":"it-IT","isPartOf":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#website"},"breadcrumb":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#breadcrumblist"},"author":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/author\/alex\/#author"},"creator":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/author\/alex\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#mainImage","width":1280,"height":720,"caption":"An excavator loads material into a truck for the Rumah Kambera land preparation works, October 2026."},"primaryImageOfPage":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/#mainImage"},"datePublished":"2026-10-23T11:34:50+08:00","dateModified":"2026-10-23T11:46:34+08:00"},{"@type":"WebSite","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#website","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/","name":"Rumah Kambera | Fair Future Foundation","description":"Building a permanent medical, social and logistics centre in East Sumba.","inLanguage":"it-IT","publisher":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/#organization"}}]},"og:locale":"it_IT","og:site_name":"Rumah Kambera | Fair Future Foundation - Building a permanent medical, social and logistics centre in East Sumba.","og:type":"article","og:title":"75 of 100 sirtu truckloads delivered to Rumah Kambera","og:description":"Deliveries are expected to finish on 23 October. Next week an excavator will spread and level the fill across the sloping section of the Kawangu site.","og:url":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/","og:image":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg","og:image:secure_url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-excavator-truck-sirtu-1280x720-1.jpg","og:image:width":1280,"og:image:height":720,"article:published_time":"2026-10-23T03:34:50+00:00","article:modified_time":"2026-10-23T03:46:34+00:00","article:publisher":"https:\/\/www.facebook.com\/fairfuturefoundation\/","twitter:card":"summary_large_image","twitter:site":"@fairfuture","twitter:title":"Rumah Kambera: 75 of 100 truckloads delivered","twitter:description":"Sirtu deliveries approach completion in Kawangu, ahead of next week's land levelling.","twitter:creator":"@fairfuture","twitter:image":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/thumbs-rk2-simulation-sketchup-1920x1080-1.jpg"},"aioseo_meta_data":{"post_id":"681","title":"Rumah Kambera Consegne sirtu | 75 dei 100 camion","description":"Il 22 ottobre erano gi\u00e0 arrivati 75 camion sirtu Rumah Kambera; gli ultimi 25 sono previsti per il 23 ottobre, mentre il livellamento del terreno \u00e8 previsto per la prossima settimana.","keywords":null,"keyphrases":{"focus":{"keyphrase":"Rumah Kambera sirtu deliveries"},"additional":[{"keyphrase":"Kawangu land levelling"},{"keyphrase":"Rumah Kambera construction"}]},"focus_keyword":"Rumah Kambera sirtu deliveries","additional_keywords":[{"word":"Kawangu land levelling","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Rumah Kambera construction","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":"75 of 100 sirtu truckloads delivered to Rumah Kambera","og_description":"Deliveries are expected to finish on 23 October. Next week an excavator will spread and level the fill across the sloping section of the Kawangu site.","og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":"Rumah Kambera: 75 of 100 truckloads delivered","twitter_description":"Sirtu deliveries approach completion in Kawangu, ahead of next week's land levelling.","schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":"2026-10-23 03:46:45","created":"2026-10-23 03:34:52","updated":"2026-10-23 04:00:22","reviewed_by":"0"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/\" title=\"Field Notes\">Field Notes<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/\" title=\"Construction &amp; Infrastructure\">Construction &amp; Infrastructure<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tSirtu deliveries near completion: 75 of 100 truckloads received\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/"},{"label":"Field Notes","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/"},{"label":"Construction &amp; Infrastructure","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/topic\/construction-infrastructure\/"},{"label":"Sirtu deliveries near completion: 75 of 100 truckloads received","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/field-notes\/rumah-kambera-sirtu-75-truckloads-october-23-2026\/"}],"_links":{"self":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/rk_field_note\/681","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/rk_field_note"}],"about":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/types\/rk_field_note"}],"author":[{"embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/rk_field_note\/681\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/media\/682"}],"wp:attachment":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/media?parent=681"}],"wp:term":[{"taxonomy":"rk_note_topic","embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/it\/wp-json\/wp\/v2\/rk_note_topic?post=681"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}