{"id":617,"date":"2026-10-18T21:48:39","date_gmt":"2026-10-18T13:48:39","guid":{"rendered":"https:\/\/rumahkambera.fairfuturefoundation.org\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/"},"modified":"2026-10-23T11:49:27","modified_gmt":"2026-10-23T03:49:27","slug":"kawangu-sirtu-website-wird-im-oktober-2026-fertiggestellt","status":"publish","type":"rk_field_note","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/","title":{"rendered":"Baustellenebene: 100 Lkw-Ladungen Sirtu sollen ab dem 20. Oktober verlegt werden"},"content":{"rendered":"<p>Heute, am Sonntag, dem 18. Oktober, trafen wir uns auf der Rumah Kambera Baustelle Kawangu in East Sumba, um die n\u00e4chste Bauphase vorzubereiten.<\/p>\n<p>Am Dienstag, dem 20. Oktober, planen wir den Beginn <strong>F\u00fcllung und Erh\u00f6hung des schr\u00e4gen Abschnitts des Gel\u00e4ndes<\/strong> Verwendung <em>sirtu<\/em>, Eine Mischung aus Sand und Kies. Wir erwarten etwa <strong>100 Lkw-Ladungen<\/strong>, mit jeweils rund 10 Tonnen Gewicht <strong>10 m\u00b3<\/strong>, oder etwa <strong>1.000 m\u00b3<\/strong> der gelieferten Materialien.<\/p>\n<p>Die gesch\u00e4tzten Kosten des <strong>sirtu und seine Lieferung<\/strong> ist <strong>IDR 22.500.000<\/strong>: 100 Ladungen f\u00fcr 225.000 IDR (ungef\u00e4hr 11 CHF pro Ladung).<\/p>\n<p>Die Lkw werden das Material in aufeinanderfolgenden Stapeln \u00fcber den Arbeitsbereich abladen. <strong>Dann wird ein Bagger angeheuert, um den Sirtu zu verteilen, zu verstreuen und zu nivellieren.<\/strong> \u00dcber den zu erhebenden Abschnitt hinaus. Die gesch\u00e4tzten Kosten des Baggers f\u00fcr diese Arbeit belaufen sich auf <strong>IDR 7.000.000<\/strong>.<\/p>\n<p>Der Gesamtbudget f\u00fcr diese Phase ist daher <strong>IDR 29.500.000<\/strong>, ungef\u00e4hr <strong>CHF 1.440<\/strong> Grunds\u00e4tzlich basierend auf der hier verwendeten Indikativumrechnung. Wir erwarten, dass der Vorgang etwa <strong>zehn Tage<\/strong>. Dies sind geplante Arbeiten und gesch\u00e4tzte Kosten, nicht bereits geleistete Ausgaben.<\/p>\n<p><a href=\"https:\/\/fairfuturefoundation.org\/donate\/\" target=\"_blank\" rel=\"noopener noreferrer\">Hilf bei der Entwicklung Rumah Kambera: Unterst\u00fctze das Projekt \u00fcber Fair Future Foundation \u2197<\/a><\/p>","protected":false},"excerpt":{"rendered":"<p>18. Oktober 2026: Die Erdarbeiten am Bauplatz sollen ab dem 20. Oktober beginnen. Rund 100 Lkw-Ladungen (1.000 m\u00b3) Sirtu kosten 22,5 Millionen IDR, hinzu kommen 7 Millionen IDR f\u00fcr den Bagger, der sie verstreut und nivelliert. Gesamtbetrag: 29,5 Millionen IDR.<\/p>","protected":false},"author":1,"featured_media":684,"template":"","rk_note_topic":[10],"class_list":["post-617","rk_field_note","type-rk_field_note","status-publish","has-post-thumbnail","hentry","rk_note_topic-construction-infrastructure"],"aioseo_notices":[],"aioseo_head":"\n\t\t<!-- All in One SEO Pro 5.0.4 - aioseo.com -->\n\t<meta name=\"description\" content=\"From 20 October 2026, 100 truckloads of sirtu and an excavator are planned to level the Kawangu construction site. Estimated budget: IDR 29.5 million.\" \/>\n\t<meta name=\"robots\" content=\"max-snippet:-1, max-image-preview:large, max-video-preview:-1\" \/>\n\t<meta name=\"author\" content=\"Alex\"\/>\n\t<meta name=\"p:domain_verify\" content=\"eec8952b4679e043cc524cc08174327e\" \/>\n\t<link rel=\"canonical\" href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/\" \/>\n\t\t<meta name=\"generator\" content=\"All in One SEO Pro (AIOSEO) 5.0.4\" \/>\n\t\t<meta property=\"og:locale\" content=\"de_DE\" \/>\n\t\t<meta property=\"og:site_name\" content=\"Rumah Kambera | Fair Future Foundation - Building a permanent medical, social and logistics centre in East Sumba.\" \/>\n\t\t<meta property=\"og:type\" content=\"article\" \/>\n\t\t<meta property=\"og:title\" content=\"100 truckloads planned for Rumah Kambera site levelling\" \/>\n\t\t<meta property=\"og:description\" content=\"Estimated site-levelling budget: IDR 22.5 million for sirtu deliveries and IDR 7 million for the excavator, starting 20 October 2026.\" \/>\n\t\t<meta property=\"og:url\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/\" \/>\n\t\t<meta property=\"og:image\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg\" \/>\n\t\t<meta property=\"og:image:secure_url\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg\" \/>\n\t\t<meta property=\"og:image:width\" content=\"1280\" \/>\n\t\t<meta property=\"og:image:height\" content=\"721\" \/>\n\t\t<meta property=\"article:published_time\" content=\"2026-10-18T13:48:39+00:00\" \/>\n\t\t<meta property=\"article:modified_time\" content=\"2026-10-23T03:49:27+00:00\" \/>\n\t\t<meta property=\"article:publisher\" content=\"https:\/\/www.facebook.com\/fairfuturefoundation\/\" \/>\n\t\t<meta name=\"twitter:card\" content=\"summary_large_image\" \/>\n\t\t<meta name=\"twitter:site\" content=\"@fairfuture\" \/>\n\t\t<meta name=\"twitter:title\" content=\"Rumah Kambera sirtu levelling plan and budget\" \/>\n\t\t<meta name=\"twitter:description\" content=\"100 truckloads, about 1,000 m\u00b3 of sirtu, and an excavator to level the Kawangu site. Estimated cost: IDR 29.5 million.\" \/>\n\t\t<meta name=\"twitter:creator\" content=\"@fairfuture\" \/>\n\t\t<meta name=\"twitter:image\" content=\"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/thumbs-rk2-simulation-sketchup-1920x1080-1.jpg\" \/>\n\t\t<script type=\"application\/ld+json\" class=\"aioseo-schema\">\n\t\t\t{\"@context\":\"https:\\\/\\\/schema.org\",\"@graph\":[{\"@type\":\"BlogPosting\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#blogposting\",\"name\":\"Sirtu Site Levelling Budget | Rumah Kambera\",\"headline\":\"Site levelling: 100 truckloads of sirtu planned from 20 October\",\"author\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/author\\\/alex\\\/#author\"},\"publisher\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#organization\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg\",\"width\":1280,\"height\":721,\"caption\":\"Sirtu deliveries begin at the Rumah Kambera construction site \\u00b7 Kawangu, October 2026.\"},\"datePublished\":\"2026-10-18T21:48:39+08:00\",\"dateModified\":\"2026-10-23T11:49:27+08:00\",\"inLanguage\":\"de-CH\",\"mainEntityOfPage\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#webpage\"},\"isPartOf\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#webpage\"},\"articleSection\":\"Construction &amp; Infrastructure\"},{\"@type\":\"BreadcrumbList\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#breadcrumblist\",\"itemListElement\":[{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#listItem\",\"position\":1,\"name\":\"Home\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/#listItem\",\"name\":\"Field Notes\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/#listItem\",\"position\":2,\"name\":\"Field Notes\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"name\":\"Construction &amp; Infrastructure\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#listItem\",\"name\":\"Home\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"position\":3,\"name\":\"Construction &amp; Infrastructure\",\"item\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/\",\"nextItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#listItem\",\"name\":\"Site levelling: 100 truckloads of sirtu planned from 20 October\"},\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/#listItem\",\"name\":\"Field Notes\"}},{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#listItem\",\"position\":4,\"name\":\"Site levelling: 100 truckloads of sirtu planned from 20 October\",\"previousItem\":{\"@type\":\"ListItem\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/topic\\\/construction-infrastructure\\\/#listItem\",\"name\":\"Construction &amp; Infrastructure\"}}]},{\"@type\":\"Organization\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#organization\",\"name\":\"Fair Future Foundation\",\"description\":\"Swiss medical nonprofit supporting primary care, clean water, prevention and community health in rural East Sumba, Indonesia.\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/\",\"telephone\":\"+6287777333384\",\"logo\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/09\\\/fair-future-foundation-logo-swiss-flag.png\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#organizationLogo\",\"width\":300,\"height\":61,\"caption\":\"Fair Future Foundation, Switzerland.\"},\"image\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#organizationLogo\"},\"sameAs\":[\"https:\\\/\\\/www.facebook.com\\\/fairfuturefoundation\\\/\",\"https:\\\/\\\/x.com\\\/fairfuture\",\"https:\\\/\\\/www.instagram.com\\\/fairfuturefoundation\\\/\",\"https:\\\/\\\/www.tiktok.com\\\/@fairfuturefoundation\",\"https:\\\/\\\/id.pinterest.com\\\/fairfuturefoundation\",\"https:\\\/\\\/www.youtube.com\\\/c\\\/FairFutureFoundation\",\"https:\\\/\\\/www.linkedin.com\\\/company\\\/fair-future-foundation\\\/\",\"https:\\\/\\\/bsky.app\\\/profile\\\/fairfuturefoundation.org\",\"https:\\\/\\\/www.threads.com\\\/@fairfuturefoundation\"]},{\"@type\":\"Person\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/author\\\/alex\\\/#author\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/author\\\/alex\\\/\",\"name\":\"Alex\",\"image\":{\"@type\":\"ImageObject\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#authorImage\",\"url\":\"https:\\\/\\\/secure.gravatar.com\\\/avatar\\\/1533db74d7967001a3bd31a71806f2622ba29add6c5e7758f02e4e6ef4ebdaca?s=96&d=mm&r=g\",\"width\":96,\"height\":96,\"caption\":\"Alex\"}},{\"@type\":\"WebPage\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#webpage\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/\",\"name\":\"Sirtu Site Levelling Budget | Rumah Kambera\",\"description\":\"From 20 October 2026, 100 truckloads of sirtu and an excavator are planned to level the Kawangu construction site. Estimated budget: IDR 29.5 million.\",\"inLanguage\":\"de-CH\",\"isPartOf\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#website\"},\"breadcrumb\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#breadcrumblist\"},\"author\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/author\\\/alex\\\/#author\"},\"creator\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/author\\\/alex\\\/#author\"},\"image\":{\"@type\":\"ImageObject\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/wp-content\\\/uploads\\\/2026\\\/10\\\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#mainImage\",\"width\":1280,\"height\":721,\"caption\":\"Sirtu deliveries begin at the Rumah Kambera construction site \\u00b7 Kawangu, October 2026.\"},\"primaryImageOfPage\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/field-notes\\\/kawangu-sirtu-site-levelling-october-2026\\\/#mainImage\"},\"datePublished\":\"2026-10-18T21:48:39+08:00\",\"dateModified\":\"2026-10-23T11:49:27+08:00\"},{\"@type\":\"WebSite\",\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#website\",\"url\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/\",\"name\":\"Rumah Kambera | Fair Future Foundation\",\"description\":\"Building a permanent medical, social and logistics centre in East Sumba.\",\"inLanguage\":\"de-CH\",\"publisher\":{\"@id\":\"https:\\\/\\\/rumahkambera.fairfuturefoundation.org\\\/de\\\/#organization\"}}]}\n\t\t<\/script>\n\t\t<!-- All in One SEO Pro -->\r\n\t\t<title>Sirtu Site Levelling Budget | Rumah Kambera<\/title>\n\n","aioseo_head_json":{"title":"Sirtu-Website-Ausgleichsbudget | Rumah Kambera","description":"Ab dem 20. Oktober 2026 sollen 100 Lastwagen voller sirtu und ein Bagger den Kawangu Baustelleneingriff durchf\u00fchren. Sch\u00e4tzbares Budget: IDR 29,5 Millionen.","canonical_url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/","robots":"max-snippet:-1, max-image-preview:large, max-video-preview:-1","keywords":"","webmasterTools":{"p:domain_verify":"eec8952b4679e043cc524cc08174327e","miscellaneous":""},"schema":{"@context":"https:\/\/schema.org","@graph":[{"@type":"BlogPosting","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#blogposting","name":"Sirtu Site Levelling Budget | Rumah Kambera","headline":"Site levelling: 100 truckloads of sirtu planned from 20 October","author":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/author\/alex\/#author"},"publisher":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#organization"},"image":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg","width":1280,"height":721,"caption":"Sirtu deliveries begin at the Rumah Kambera construction site \u00b7 Kawangu, October 2026."},"datePublished":"2026-10-18T21:48:39+08:00","dateModified":"2026-10-23T11:49:27+08:00","inLanguage":"de-CH","mainEntityOfPage":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#webpage"},"isPartOf":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#webpage"},"articleSection":"Construction &amp; Infrastructure"},{"@type":"BreadcrumbList","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#breadcrumblist","itemListElement":[{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#listItem","position":1,"name":"Home","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/#listItem","name":"Field Notes"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/#listItem","position":2,"name":"Field Notes","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/#listItem","name":"Construction &amp; Infrastructure"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#listItem","name":"Home"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/#listItem","position":3,"name":"Construction &amp; Infrastructure","item":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/","nextItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#listItem","name":"Site levelling: 100 truckloads of sirtu planned from 20 October"},"previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/#listItem","name":"Field Notes"}},{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#listItem","position":4,"name":"Site levelling: 100 truckloads of sirtu planned from 20 October","previousItem":{"@type":"ListItem","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/#listItem","name":"Construction &amp; Infrastructure"}}]},{"@type":"Organization","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#organization","name":"Fair Future Foundation","description":"Swiss medical nonprofit supporting primary care, clean water, prevention and community health in rural East Sumba, Indonesia.","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/","telephone":"+6287777333384","logo":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/fair-future-foundation-logo-swiss-flag.png","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#organizationLogo","width":300,"height":61,"caption":"Fair Future Foundation, Switzerland."},"image":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#organizationLogo"},"sameAs":["https:\/\/www.facebook.com\/fairfuturefoundation\/","https:\/\/x.com\/fairfuture","https:\/\/www.instagram.com\/fairfuturefoundation\/","https:\/\/www.tiktok.com\/@fairfuturefoundation","https:\/\/id.pinterest.com\/fairfuturefoundation","https:\/\/www.youtube.com\/c\/FairFutureFoundation","https:\/\/www.linkedin.com\/company\/fair-future-foundation\/","https:\/\/bsky.app\/profile\/fairfuturefoundation.org","https:\/\/www.threads.com\/@fairfuturefoundation"]},{"@type":"Person","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/author\/alex\/#author","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/author\/alex\/","name":"Alex","image":{"@type":"ImageObject","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#authorImage","url":"https:\/\/secure.gravatar.com\/avatar\/1533db74d7967001a3bd31a71806f2622ba29add6c5e7758f02e4e6ef4ebdaca?s=96&d=mm&r=g","width":96,"height":96,"caption":"Alex"}},{"@type":"WebPage","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#webpage","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/","name":"Sirtu Site Levelling Budget | Rumah Kambera","description":"From 20 October 2026, 100 truckloads of sirtu and an excavator are planned to level the Kawangu construction site. Estimated budget: IDR 29.5 million.","inLanguage":"de-CH","isPartOf":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#website"},"breadcrumb":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#breadcrumblist"},"author":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/author\/alex\/#author"},"creator":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/author\/alex\/#author"},"image":{"@type":"ImageObject","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#mainImage","width":1280,"height":721,"caption":"Sirtu deliveries begin at the Rumah Kambera construction site \u00b7 Kawangu, October 2026."},"primaryImageOfPage":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/#mainImage"},"datePublished":"2026-10-18T21:48:39+08:00","dateModified":"2026-10-23T11:49:27+08:00"},{"@type":"WebSite","@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#website","url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/","name":"Rumah Kambera | Fair Future Foundation","description":"Building a permanent medical, social and logistics centre in East Sumba.","inLanguage":"de-CH","publisher":{"@id":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/#organization"}}]},"og:locale":"de_DE","og:site_name":"Rumah Kambera | Fair Future Foundation - Building a permanent medical, social and logistics centre in East Sumba.","og:type":"article","og:title":"100 truckloads planned for Rumah Kambera site levelling","og:description":"Estimated site-levelling budget: IDR 22.5 million for sirtu deliveries and IDR 7 million for the excavator, starting 20 October 2026.","og:url":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/","og:image":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg","og:image:secure_url":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/10\/latest-from-the-field-truck-sirtu-1-1280x720-1.jpg","og:image:width":1280,"og:image:height":721,"article:published_time":"2026-10-18T13:48:39+00:00","article:modified_time":"2026-10-23T03:49:27+00:00","article:publisher":"https:\/\/www.facebook.com\/fairfuturefoundation\/","twitter:card":"summary_large_image","twitter:site":"@fairfuture","twitter:title":"Rumah Kambera sirtu levelling plan and budget","twitter:description":"100 truckloads, about 1,000 m\u00b3 of sirtu, and an excavator to level the Kawangu site. Estimated cost: IDR 29.5 million.","twitter:creator":"@fairfuture","twitter:image":"https:\/\/rumahkambera.fairfuturefoundation.org\/wp-content\/uploads\/2026\/09\/thumbs-rk2-simulation-sketchup-1920x1080-1.jpg"},"aioseo_meta_data":{"post_id":"617","title":"Sirtu-Website-Ausgleichsbudget | Rumah Kambera","description":"Ab dem 20. Oktober 2026 sollen 100 Lastwagen voller sirtu und ein Bagger den Kawangu Baustelleneingriff durchf\u00fchren. Sch\u00e4tzbares Budget: IDR 29,5 Millionen.","keywords":null,"keyphrases":{"focus":{"keyphrase":"sirtu site levelling"},"additional":[{"keyphrase":"Rumah Kambera land filling"},{"keyphrase":"Kawangu construction site"},{"keyphrase":"sirtu truckloads"}]},"focus_keyword":"sirtu site levelling","additional_keywords":[{"word":"Rumah Kambera land filling","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"Kawangu construction site","score":80,"items":{"introductionKeyword":{"score":9},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}},{"word":"sirtu truckloads","score":69,"items":{"introductionKeyword":{"score":3},"keyphraseLength":{"score":9},"keyphraseDensity":{"score":4},"functionWordsInKeyphrase":{"score":9},"textCompetingLinks":{"score":9},"imageKeyphrase":{"score":3}}}],"truseo_locale":null,"primary_term":null,"canonical_url":null,"og_title":"100 truckloads planned for Rumah Kambera site levelling","og_description":"Estimated site-levelling budget: IDR 22.5 million for sirtu deliveries and IDR 7 million for the excavator, starting 20 October 2026.","og_object_type":"default","og_image_type":"default","og_image_custom_url":null,"og_image_custom_fields":null,"og_image_url":null,"og_image_width":null,"og_image_height":null,"og_video":"","og_custom_url":null,"og_article_section":null,"og_article_tags":null,"twitter_use_og":false,"twitter_card":"default","twitter_image_type":"default","twitter_image_custom_url":null,"twitter_image_custom_fields":null,"twitter_image_url":null,"twitter_title":"Rumah Kambera sirtu levelling plan and budget","twitter_description":"100 truckloads, about 1,000 m\u00b3 of sirtu, and an excavator to level the Kawangu site. Estimated cost: IDR 29.5 million.","schema_type":"default","schema_type_options":null,"schema":{"blockGraphs":[],"customGraphs":[],"default":{"data":{"Article":[],"Course":[],"Dataset":[],"FAQPage":[],"Movie":[],"Person":[],"Product":[],"ProductReview":[],"Car":[],"Recipe":[],"Service":[],"SoftwareApplication":[],"WebPage":[]},"graphName":"BlogPosting","isEnabled":true},"graphs":[]},"pillar_content":false,"robots_default":true,"robots_noindex":false,"robots_noarchive":false,"robots_nosnippet":false,"robots_nofollow":false,"robots_noimageindex":false,"robots_noodp":false,"robots_notranslate":false,"robots_max_snippet":"-1","robots_max_videopreview":"-1","robots_max_imagepreview":"large","priority":null,"frequency":"default","local_seo":null,"limit_modified_date":false,"ai":{"faqs":[],"keyPoints":[],"schemas":[],"titles":[],"descriptions":[],"socialPosts":{"email":{"subject":"","preview":"","content":""},"linkedin":[],"twitter":[],"facebook":[],"instagram":[]}},"breadcrumb_settings":null,"seo_analyzer_scan_date":"2026-10-23 03:50:06","created":"2026-10-18 13:48:41","updated":"2026-10-23 04:00:22","reviewed_by":"0"},"aioseo_breadcrumb":"<div class=\"aioseo-breadcrumbs\"><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/\" title=\"Home\">Home<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/\" title=\"Field Notes\">Field Notes<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\t<a href=\"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/\" title=\"Construction &amp; Infrastructure\">Construction &amp; Infrastructure<\/a>\n<\/span><span class=\"aioseo-breadcrumb-separator\">\u00bb<\/span><span class=\"aioseo-breadcrumb\">\n\tSite levelling: 100 truckloads of sirtu planned from 20 October\n<\/span><\/div>","aioseo_breadcrumb_json":[{"label":"Home","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/"},{"label":"Field Notes","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/"},{"label":"Construction &amp; Infrastructure","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/topic\/construction-infrastructure\/"},{"label":"Site levelling: 100 truckloads of sirtu planned from 20 October","link":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/field-notes\/kawangu-sirtu-site-levelling-october-2026\/"}],"_links":{"self":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/rk_field_note\/617","targetHints":{"allow":["GET"]}}],"collection":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/rk_field_note"}],"about":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/types\/rk_field_note"}],"author":[{"embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/users\/1"}],"version-history":[{"count":0,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/rk_field_note\/617\/revisions"}],"wp:featuredmedia":[{"embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/media\/684"}],"wp:attachment":[{"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/media?parent=617"}],"wp:term":[{"taxonomy":"rk_note_topic","embeddable":true,"href":"https:\/\/rumahkambera.fairfuturefoundation.org\/de\/wp-json\/wp\/v2\/rk_note_topic?post=617"}],"curies":[{"name":"wp","href":"https:\/\/api.w.org\/{rel}","templated":true}]}}